NEW QUESTION # 37
What can you use stard heuristics in Advanced Planning (PP/DS) for?
- A. To automate material movements in material staging
- B. To solve planning problems for defined objects
- C. To optimize costs times in production plans
- D. To set default values in production master data
Answer: B
NEW QUESTION # 38
Which of the following questions do you have to answer before you start creating a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. What status does the BOM have?
- B. Is the material type allowed in the BOM?
- C. Which base unit of measure does the material have?
- D. In which storage location is the BOM required?
Answer: A,B
NEW QUESTION # 39
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.
- A. First in first out (FIFO)
- B. Simultaneous
- C. Manual maintenance
- D. 100% check
Answer: C,D
NEW QUESTION # 40
Which time elements are relevant for lead time scheduling of a production order?
Note: There are 2 correct answers to this question.
- A. Opening period
- B. Total replenishment lead time
- C. Setup time
- D. Float after production
Answer: C,D
NEW QUESTION # 41
What are the advantages of collective orders?
Note: There are 2 correct answers to this question.
- A. To coordinate orders in the planning board for a collective order
- B. To perform availability checks across the entire collective order
- C. To show the flow of batches across the entire collective order
- D. To post confirmations for the entire collective order
Answer: B,D
NEW QUESTION # 42
Where do you maintain the work center that represents the production line for repetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Routing
- B. Production cost collector
- C. Production version
- D. Repetitive manufacturing profile
Answer: A,C
NEW QUESTION # 43
Which supply chain planning components can you find in SAP S/4HANA?
There are 2 correct answers to this question.
- A. Supply Network Planning
- B. Supply Chain Control Tower
- C. Capacity Requirements Planning
- D. Advanced Planning
Answer: C,D
NEW QUESTION # 44
What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?
- A. A sales order is created.
- B. A sales order is delivered.
- C. MRP creates a dependent requirement.
- D. MRP creates a planned order.
Answer: A
NEW QUESTION # 45
Your quality department detects a deviation in a raw material batch. Unfortunately this batch has already been used in production.
How can you identify all affected finished goods stocks?
Note: There are 2 correct answers to this question.
- A. Use batch determination.
- B. Use the batch whereused list.
- C. Use batch derivation.
- D. Use the Batch Information Cockpit.
Answer: B,D
NEW QUESTION # 46
Why do you use Engineering Change Management?
Note: There are 2 correct answers to this question.
- A. To save multiple changes for an object
- B. To monitor document object changes
- C. To monitor document table changes
- D. To enable integration into a sales order
Answer: A,B
NEW QUESTION # 47
What information do you have to maintain to define the relationship between supply source dem source in the Kanban process?
Note: There are 2 correct answers to this question.
- A. Replenishment strategy
- B. Work Center
- C. Routing
- D. Production supply area
Answer: A,D
NEW QUESTION # 48
In your plant MRP is activated.
Which options do you have to exclude a material from the MRP run?
Note: There are 2 correct answers to this question.
- A. Use a specific MRP type.
- B. Use a specific material group.
- C. Use a specific material status.
- D. Use a specific MRP list.
Answer: A,C
NEW QUESTION # 49
How can you achieve a feasible production plan in case of capacity constraints?
Note: There are 3 correct answers to this question.
- A. Reduce the planning time interval.
- B. Determine a time period with available capacity on the planning board.
- C. Execute an infinite production planning run for the critical resources.
- D. Increase the capacity supply in a timephased interval.
- E. Form optimum sequences to reduce setup times.
Answer: B,D,E
NEW QUESTION # 50
How are dependent requirements for assemblies created?
Note: There are 2 correct answers to this question.
- A. They are created with exact times in Advanced Planning.
- B. They are only created for multilevel bill of material (BOM) structures.
- C. They are created together with the independent requirement for the finished product.
- D. They are created on assembly level during the planning run.
Answer: A,D
NEW QUESTION # 51
What data can you maintain in the subitems of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. Status
- B. Quantity
- C. Scrap percentage
- D. Installation point
Answer: B,D
NEW QUESTION # 52
Your company produces a finished good based on a forecast expects it to be in stock when customers order it. If customers order more than the forecasted quantity this must NOT have any impact on the production program.
Which planning strategy do you use?
- A. Maketostock production (10)
- B. Planning without final assembly (50)
- C. Planning with final assembly (40)
- D. Assembly processing with production orders (82)
Answer: A
NEW QUESTION # 53
What is the difference between coproducts byproducts?
Note: There are 2 correct answers to this question.
- A. Only coproducts have movement type 531.
- B. Only coproducts appear in the process or production order settlement rule.
- C. Only coproducts have a nonzero inventory valuation.
- D. Only coproducts have movement type 101.
Answer: B,D
NEW QUESTION # 54
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from depender?
Note: There are 2 correct answers to this question.
- A. Planned delivery time
- B. Inhouse production time
- C. Operation duration
- D. Total replenishment lead time
Answer: A,B
NEW QUESTION # 55
Which options do you have to plan both quantities capacities during line loading in repetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Run PP/DS heuristics for repetitive manufacturing.
- B. Assign planned orders manually in the planning table.
- C. Run MRP with quota arrangement.
- D. Run MRP with automatic selection of production version.
Answer: A,C
NEW QUESTION # 56
You run MRP for a material that was planned using Demand-Driven Replenishment. Towards which buffer level does the MRP run create a replenishment proposal?
Please choose the correct answer.
- A. Top of Red Base
- B. Top of Green
- C. Top of Yellow
- D. Top of Red
Answer: B
NEW QUESTION # 57
You are a consultant on an SAP S/4HANA Cloud Greenfield project.
Which of the following aspects should you focus on to achieve maintain clean core data quality?
Note: There are 2 correct answers to this question.
- A. Efficiency
- B. Stability
- C. Timeliness
- D. Accuracy
Answer: A,B
NEW QUESTION # 58
What options does a planner have in the planning table for repetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Dispatch operations to work centers.
- B. Change the assignments of production quantities to production lines.
- C. Reschedule deallocate operations.
- D. Create new production quantities.
Answer: B,C
NEW QUESTION # 59
Where do you maintain data to determine the duration of an operation for production?
Note: There are 2 correct answers to this question.
- A. Material master
- B. Routing
- C. Production version
- D. Work center
Answer: B,D
NEW QUESTION # 60
Which of the following elements does MRP take into account during net requirement calculation?
Note: There are 2 correct answers to this question.
- A. Planned orders (firmed)
- B. Planned orders (unfirmed)
- C. Production orders
- D. ATP quantities
Answer: A,C
NEW QUESTION # 61
......