Prepare C-TS422-2020 Question Answers Free Update With 100% Exam Passing Guarantee [Q86-Q110]

Share

Prepare C-TS422-2020 Question Answers Free Update With 100% Exam Passing Guarantee [2022]

Dumps Real SAP C-TS422-2020 Exam Questions [Updated 2022]

NEW QUESTION 86
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.

  • A. Past sales order quantities
  • B. Market intelligence
  • C. One-off events
  • D. Past quotation quantities
  • E. Past procurement quantities

Answer: A,B,C

 

NEW QUESTION 87
Which of the following is an advantage of MRP Live and NOT available in classical MRP? There are 2 correct answers to this question.

  • A. MRP Live can priorities demand from sales orders
  • B. MRP Live can propose alternative solutions
  • C. MRP Live can plan materials with recursive BOMs
  • D. MRP Live can create production orders automatically

Answer: B,D

 

NEW QUESTION 88
What is the difference between co-products and by-products?

  • A. Only co-products are identified by a special item category in the bill of material (BOM).
  • B. Only by-products have a zero inventory valuation.
  • C. Only co-products appear in the processor production order settlement rule.
  • D. Onlyco-products can be manufactured in isolation from the main product.

Answer: C

 

NEW QUESTION 89
What data processing steps are obsolete if you use SAP S/4HANA Analytics? There are 2 correct answers to this question

  • A. Online analytical processing (OLAP)
  • B. Pre computed aggregation views
  • C. Online transaction processing (OLTP)
  • D. Extract on, transformation, and loading (ETL)

Answer: B,D

 

NEW QUESTION 90
You want to integrate an existing planned order into Advanced Production Planning. Which report do you use? Please choose the correct answer.

  • A. /SAPAPO/CREATE_LOCATION
  • B. /SAPAPO/CURTO_CREATE
  • C. /SAPAPO/UPD_LOC_SP_PL
  • D. /SAPAPO/PPDS_DELTA_ORD_TRANS

Answer: D

 

NEW QUESTION 91
Which reports can you access via the order and resource reporting transaction in advanced planning? There are 3 correct answers to this question

  • A. Operation list
  • B. Production list
  • C. Production overview
  • D. Planning file entries
  • E. WIP list

Answer: A,C,E

 

NEW QUESTION 92
Which task list types can have parallel sequences? There are 2 correct answers to this question.

  • A. Routings (N)
  • B. Rate routings (R)
  • C. Reference operation sets (S)
  • D. Master recipes (2)

Answer: A,B

 

NEW QUESTION 93
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?

  • A. The item category of the component in the BOM
  • B. The MRP Type of the component
  • C. The Individual/Collective indicator of the component
  • D. The Planning Strategy of the finished product

Answer: C

 

NEW QUESTION 94
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Please choose the correct answer.

  • A. Material Master -> MRP Group -> Plant Settings
  • B. Plant Settings -> MRP Group -> Material Master
  • C. Material Master -> Plant Settings -> MRP Group
  • D. MRP Group -> Material Master -> Plant Settings

Answer: A

 

NEW QUESTION 95
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • B. MRP creates capacity requirements only if the work center has sufficient capacity.
  • C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  • D. MRP creates capacity requirements without checking the capacity of a work center.

Answer: D

 

NEW QUESTION 96
You are creating a production order manually. What activities are involved in this process?
There are 3 correct answers to this question.

  • A. Capacity requirements determination
  • B. Actual cost calculation
  • C. Planning selection
  • D. Master data selection
  • E. Order type determination

Answer: A,D,E

 

NEW QUESTION 97
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?

  • A. Scheduling working time only
  • B. Squeezing
  • C. Find Slot
  • D. Insert operation

Answer: C

 

NEW QUESTION 98
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. By period
  • B. By industry
  • C. By plant
  • D. By material type

Answer: A,C

 

NEW QUESTION 99
If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?

  • A. Production time
  • B. Goods receipt processing time
  • C. Minimum wait time
  • D. Queue time

Answer: D

 

NEW QUESTION 100
Duringproduction order creation, several valid production versions are found. How does the system choose the product conversion?

  • A. Lot size or material cost
  • B. Planned order or materialnumber
  • C. Validity period or sales order
  • D. Alphanumeric or quota arrangement

Answer: D

 

NEW QUESTION 101
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?

  • A. Specify a negative offset time in the strategy profile.
  • B. Specify a positive planning horizon in the strategy profile.
  • C. Specify a positive offset time in the strategy profile.
  • D. Specify a negative planning horizon in the strategy profile.

Answer: A

 

NEW QUESTION 102
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.
  • B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
  • C. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
  • D. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.

Answer: C

 

NEW QUESTION 103
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.

  • A. Sales order-specific planning run is required.
  • B. Sales order-specific stock is created
  • C. Storage location MRP areas are required.
  • D. Net requirements calculation is sales order-specific.
  • E. Production orders are created with sales order reference.

Answer: B,D,E

 

NEW QUESTION 104
A customer is considering switching from order-related settlement to productrelated settlement. What are capabilities of cost collectors? There are 2 correct answers to this question.

  • A. They can be applied to make-to-stock production order.
  • B. They can be used for repetitive manufacturing.
  • C. They can be created automatically during month end process.
  • D. They can be used for manufacturing with collective orders.

Answer: A,B

 

NEW QUESTION 105
In which data objects do you maintain the production line as the work center for repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Production cost collector
  • B. Routing
  • C. Repetitive manufacturing profile
  • D. Production version

Answer: B,D

 

NEW QUESTION 106
What are examples of assignment objects you can maintain in the Engineering Workbench?
There are 3 correct answers to this question.

  • A. Component assignment
  • B. Material to bill of materials (BOM) assignment
  • C. Routing to sequence assignment
  • D. Material to routing assignment
  • E. Material to production version assignment

Answer: A,B,D

 

NEW QUESTION 107
You have a quality control check to avoid using a high-value component tin faulty materials in subsequent assembly operations. How do you account for potential scrap of the high-value material?

  • A. Enter the operation scrap and set the net indicator in the component of the bill of material of the assembly.
  • B. Enter the component scrap in the component of the bill of material of the assembly and leave the net indicator initial in the bill of material.
  • C. Enter the component scrap in the material master of the assembly and set the net indicator in the routing operation where V Dthe component is used
  • D. Enter the assembly scrap in the material master of the component and set the net indicator in the component of the bill of material of the assembly.

Answer: C

 

NEW QUESTION 108
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.

  • A. Create object selection variant for product-related alerts.
  • B. Create object selection variant for transportation lane-related alerts.
  • C. Assign the overall profile to the authorization profile.
  • D. Create object selection variant for resource-related alerts
  • E. Assign the alert profile to the overall profile.

Answer: A,D,E

 

NEW QUESTION 109
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work Center BOM
  • B. Functional Location BOM
  • C. Sales Order BOM
  • D. Class BOM

Answer: B,C

 

NEW QUESTION 110
......

C-TS422-2020 Exam Dumps, C-TS422-2020 Practice Test Questions: https://www.validbraindumps.com/C-TS422-2020-exam-prep.html