The benefit of obtaining the AACE-International CCP: Certified Cost Professional (CCP) Exam Certification

For over thirty years, certifications provided by the Association for Cost Engineering Advancement (AACE) have been a hallmark of distinction and more and more companies need this certification as a requirement for employment. CCP is one of the widely recognized AACE certifications covering topics relating to project planning and planning. A qualification from AACE also leads to better acceptance by pairs and improves the chances of employment and income.

While a licensed professional engineer is generally considered to be “certified” in any field in which he or she works, it's a national mood for both licensed and non-licensed engineers to require certification of specialty disciplines. A positive reaction to the increasing strength of our software tools in teaching, theory, and practice and qualification governed by our professional organizations, including AACE and the CCP examination mentioned above.

 

NEW QUESTION 41
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
According to Maslow's hierarchy of needs, which level should be satisfied first?

  • A. Ego-status
  • B. Self-actualization
  • C. Physiological
  • D. Safety needs

Answer: C

 

NEW QUESTION 42

The following question requires your selection of CCC/CCE Scenario 4 (2.7.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
What is the cost of manufacturing labor for the piece of equipment today?

  • A. $210,000
  • B. $105,000
  • C. $140,000
  • D. $875,000

Answer: C

 

NEW QUESTION 43
Cost performance index (CPI) is defined by AACE International as: (assume no change in budgeted quantities)

  • A. ACWP/BCWP
  • B. BCWS/BCWP
  • C. BCWP/ACWP
  • D. ACWP/BCWS

Answer: C

 

NEW QUESTION 44
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
Which of the following percent complete measurement techniques is best suited for long-term non-production accounts (such as overhead accounts)?

  • A. Start/finish
  • B. Units completed
  • C. Ratio/level of effort
  • D. Incremental milestone

Answer: D

 

NEW QUESTION 45
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
According to Maslow's hierarchy of needs, giving the employees an award that acknowledges their achievements is most likely to satisfy which level of need?

  • A. Self-actualization
  • B. Power needs
  • C. Belonging needs
  • D. Safety needs

Answer: A

 

NEW QUESTION 46

The following question requires your selection of CCC/CCE Scenario 2 (2.3.50.1.2) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
10,278 hours have been expended to date. The CPI at this point in time is 0.93. SPI is
1.03. How many hours have been earned?

  • A. 9,979
  • B. 11,052
  • C. 10,586
  • D. 9,559

Answer: D

 

NEW QUESTION 47
Money is value. Having money when you need it is very important. Money can also be valuable when used wisely by knowing when to spend and when to conserve Also, planning now for future expenses can be a plus to the company rather than a debit.
There are several ways to capitalize money and spending. Basically there is the single payment method that has a compound amount factor and a present worth factor. There is the uniform annual series that has a sinking fund factor, capital recovery factor and also the compound amount factor and present worth factor. At this point, we can assure money is worth 10%.
The following question requires your selection of CCC/CCE Scenario 7 (4.8.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
If the company needs to repay a loan of $100,000 in 10 uniform annual payments, how much will each payment be?

  • A. $16,578
  • B. $15,937
  • C. $16,273
  • D. $16,380

Answer: C

 

NEW QUESTION 48
Money is value. Having money when you need it is very important. Money can also be valuable when used wisely by knowing when to spend and when to conserve Also, planning now for future expenses can be a plus to the company rather than a debit.
There are several ways to capitalize money and spending. Basically there is the single payment method that has a compound amount factor and a present worth factor. There is the uniform annual series that has a sinking fund factor, capital recovery factor and also the compound amount factor and present worth factor. At this point, we can assure money is worth 10%.
The following question requires your selection of CCC/CCE Scenario 7 (4.8.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
Five years from now it is required the company have $100,000. How much money should be invested at the end of each year to reach this?

  • A. $15,937
  • B. $15,397
  • C. $13,168
  • D. $16,380

Answer: D

 

NEW QUESTION 49

The following question requires your selection of CCC/CCE Scenario 2 (2.3.50.1.2) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
9,375 hours have been expended to date. Planned completion at this time is 75%. The project is determined to be 66% complete. What is the current schedule performance index (SPI)?

  • A. 0.96
  • B. 0.84
  • C. 0.88
  • D. 1.14

Answer: D

 

NEW QUESTION 50
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
The following question requires your selection of CCC/CCE Scenario 26 (2.5.50.1.2) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
What class of estimate is used for the preliminary design phase of a project?

  • A. Class 2 - definitive estimate with +15%/-5% accuracy
  • B. Class 5 - order of magnitude estimate with +50% / -30% accuracy
  • C. Class 1 - order of magnitude with +30% / -30% accuracy
  • D. Class 4 - budget estimate with +30% / -15% accuracy

Answer: B

 

NEW QUESTION 51
An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.
Answer the question using a straight line depreciation and a 10% interest rate.
The following question requires your selection of CCC/CCE Scenario 17 (4.2.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
Annual estimated tax would be:

  • A. $3,869
  • B. $11,925
  • C. $5,565
  • D. $10,500

Answer: C

 

NEW QUESTION 52
Budgeted cost of work scheduled is all of the following except:

  • A. Sum of the budgets for work scheduled
  • B. Includes portion of the budget for level-of-effort work
  • C. Total costs incurred in accomplishing work in a given-time period
  • D. Baseline for performance measurement

Answer: B

 

NEW QUESTION 53
An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.
Answer the question using a straight line depreciation and a 10% interest rate.
If you buy a lot for $3,000 and sell it for $6,000 at the end of 8 years, what is your annual rate of return?

  • A. 9.9%
  • B. 8.3%
  • C. 9.1%
  • D. 10.4%

Answer: C

 

NEW QUESTION 54
A schedule's late dates are calculated during the:

  • A. Backward pass
  • B. Forward pass
  • C. Loop calculations
  • D. Float

Answer: A

 

NEW QUESTION 55
What is executed in connection with a contract and secures the performance and fulfillment of all the undertakings, covenants, terms, conditions and agreements contained in the contract?

  • A. Bid bond
  • B. Performance bond
  • C. Surety bond
  • D. Liability insurance

Answer: B

 

NEW QUESTION 56
An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.
Answer the question using a straight line depreciation and a 10% interest rate.
The main financial objective of many enterprises is:

  • A. Subject to a well-conceived quality control plan
  • B. To maximize the total long-term economic return
  • C. To balance opportunities and risks
  • D. Dependent on the backlog projects and the availability of resources

Answer: B

 

NEW QUESTION 57

The following question requires your selection of CCC/CCE Scenario 2 (2.3.50.1.2) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
6,573 hours have been expended to date. Planned completion at this time is 60%. The project is determined to be 55% complete. How many hours have been earned?

  • A. 7,200
  • B. 6,960
  • C. 6,573
  • D. 6,600

Answer: C

 

NEW QUESTION 58
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
Resource planning must take all of the following into account except:

  • A. Types of materials, equipment and labor skills required to complete the project
  • B. Earned value techniques established for the project
  • C. Time available to complete the project
  • D. Cash flow (expenditures) limitations for completing work on the project

Answer: B

 

NEW QUESTION 59
Listening to what is being said by all members of a group or audience and then summarizing or interpreting is called______________.

  • A. Visual listening
  • B. Directive listening
  • C. Non-listening
  • D. Facilitative listening

Answer: B

 

NEW QUESTION 60
......


Topics of AACE-International CCP: Certified Cost Professional (CCP) Exam

It is suggested that candidates utilize this and/or additional resources, including CCP exam dumps, to obtain background knowledge on the examination topics. Whenever feasible. The AACE-International CCP: Certified Professional Cost Examination curriculum is provided below with details of each part and subjects.

The Certified Cost Professional exam is a much wanted and difficult test. The examination may be intimidating if you are not properly prepared. The CCP examination comprises a closed-book examination, examines 4 modules and takes up to 120 questions. The CCP exam has two parts: the multiple-choice test and the 2,000 word research report. You must achieve the minimum total score of 70 percent to pass the test. The four modules examined for your CCP exam are:

  1. Basic abilities and expertise in cost engineering
  2. Analysis economics
  3. Management of the project
  4. Estimation and management of costs

Regarding your technical document, which is mandatory for registering for the Certified Cost Professional Examination (CCP), your trainers will advise you on suitable subjects and help you develop a solid foundation. They will also assess your work and offer comments when ready. The teachers will also verify that your paper is prepared in accordance with AACE criteria so that the examining body of AACE approves it.

Kryterion acts as a certified test proof for the Certified Cost Professional (CCP) exam with testing sites throughout the globe. You may take your computer-based test every day and whenever you want.


How to Prepare For AACE-International CCP: Certified Cost Professional (CCP) Exam

Preparation Guide for AACE-International CCP: Certified Cost Professional (CCP) Exam

Introduction

AACE International, the Association for Cost Engineering Advancement, administers the Certified Cost Professional (CCP) exam. In 1959, cost estimators and cost engineers established AACE International during the organizational conference of the American Association of Cost Engineering in Durham, New Hampshire, in 1956. (Association for the Advancement of Cost Engineering). AACE is located in Morgantown, West Virginia, USA, International Headquarters. AACE is a non-profit specialist organization. AACE Global is a participant of the Technical Specialty Boards and Engineering Council (CESB). AACE now runs eight qualification programs. The agreement and the passage of an assessment to comply with the ethical canons. Most of them need prior industrial experience and may recertify through ongoing training or re-examination. The Council of Engineering and Scientific Specialty Boards has recognized six of these certificates (CESB).

This test guide is designed to help achieve the highest possible degree of AACE specialty accreditation. It will enable you to understand the scope of the AACE-International CCP: Certified Cost Professional (CCP) Exam and help you to prepare for it successfully by making use of the provided CCP exam dumps. This guide contains information on the audience of the certification test, suggested preparation and documentation and a complete set of examination objectives, to help you get a passing score. To increase your chances of passing the test, AACE strongly recommends a mix of on-the-job experience, course attendance, and self-study, and taking the CCP practice exams.

 